Island Erosion Letter Writing Campaign
A table will be set up in front of JG’s Ship & Shore this Saturday and Sunday, March 31 and April 1with prepared letters for the public to sign in support of the Corps of Engineers developing and implementing a solution to the island’s erosion problem.
The letters specifically note the importance of the Corps including a Plan to Mitigate for sand loss in the report that will likely recommend the ship channel be deepened and widened. Please stop by and sign one of the letters and remind your family, friends, and neighbors to do the same. The long-term resiliency and stability of Dauphin Island is at stake. Thank you! |
|
Comments (0)